Industrial building with a production and warehouse part, total floor space2 660, 52 m2
The industrial shed and the office block located in the municipality of Kałuszyn in the Mazowieckie province of Poland were built for Novmax Sp. z o.o. Sp.k.
The scope of the General Contractor's services included construction of a building consisting of production and warehouse areas, an office block, 54 parking spaces complete with circulation roads, septic tank, bin shelter, electrical service line, storm drainage, exterior lighting and a guard house!
See the pictures. GALLERY